1. PLANNING PROCEDURES
2. DESIGN GUIDELINES
3. DESIGN AND CONSTRUCTION GUIDELINES
Standard Details & Computer Aided Drafting
4. CONDUCT OF THE WORK
Supplementary Conditions of the Construction Contract
5. CONTRACT DIVISIONS
- Division 1 General Requirements/Information
- Division 2 Site Work
- Division 3 Concrete
- Division 4 Masonry
- Division 5 Metals
- Division 6 Wood and Plastics
- Division 7 Thermal and Moisture Protection
- Division 8 Doors, Windows, Glass & Locks
- Division 9 Finishes
- Division 10 Specialties
- Division 11 Equipment
- Division 12 Furnishings
- Division 13 Special Construction
- Division 14 Conveying Systems
- Division 15 Mechanical Systems (Plumbing, Heating, Ventilating & Air Conditioning)
- Division 16 Electrical
- Division 16T Data, Telephone & and Television